Steam drums have been erected
On March, 2022, the steam drum, which marks a milestone in the construction of the biomass power plant along with the standing pillar, was erected.
From now on, the construction work of the power plant will reach its final stage.
*Steam drum: Equipment for separating the steam and the water generated in the boiler