Fukuroi Ugari Energy Storage Facility

The render shown is an image generated using generative AI based on design drawings, and may differ from the actual project. In addition, the details are subject to change due to future construction, specification changes, or other factors.
Planned Construction Site Ugari, Fukuroi City, Shizuoka Prefecture
Planned output (MW) 99.9MW
Planned capacity (MWh) 280MWh
Start of construction FY 2026
Operation commencement FY 2029 (plan)
Operator R6 Energy Storage Facility G.K.
Sponsors
  • RENOVA, Inc.
  • NCS RE Capital Limited
  • SMFL MIRAI Partners Company, Limited.